Architects & Contractors

Shop Drawings, Fabrication and Install

We draw our own work. Nothing gets cut before an approved sheet and a dimension we verified ourselves in the field.

Typical Details

Drawings

Details off two sheets we issued for approval, names removed. Every job gets its own set — plan, elevations, sections, embeds and connections, with a piece schedule — drawn in house, dimensioned to a field measurement, and revised until you sign it.

Post-supported Canopy

Canopy plan — post grid and projection

Transverse section — at post line

Post base — plate and anchors

Stair Guard and Handrail

Guard elevation — stair and landing

Wall-side handrail — section

Post embed — plan and section

Five Steps

How a Job Runs

  1. Takeoff & Quote

    Send the elevation, the canopy schedule and the spec section. We price material, finish, freight and install, and issue a quote with a reference number that stays with the job.

  2. Shop Drawings for Approval

    Plan, elevation, sections, attachment and drainage details, and a component schedule — in our standard sheet format, cross-referenced to the architectural drawing and the quote.

  3. Field Verification

    We measure the opening ourselves before release. Wall construction, door heights and existing conditions get confirmed on site, not assumed from the plans.

  4. Fabrication

    Cut, weld and assemble in-house to the approved set. Aluminum in mill, anodized or powder-coat finish; steel members powder coated. Panels crated by canopy.

  5. Delivery & Install

    Scheduled to the GC’s sequence. Our crew sets brackets, hangs the assembly, and turns the work over with fasteners and flashing complete.

What We Need from You

  • Architectural elevation and canopy or awning schedule
  • Spec section for finishes and structural requirements
  • Wall construction and any embed or blocking conditions
  • Site schedule and the window for field measurement

What You Get Back

  • Quote with reference number and scope inclusions
  • Approval set in PDF, revised until signed off
  • Fabrication schedule tied to your delivery date
  • Installed work, punched and turned over